• Document Centre
  • Catalogs
  • +1300554779
  • Blog
  • Products
    • Discover our Products
    • SFA Pumps Technologies
    • SFA Pumps Solutions
  • Macerators & Toilets
    • Macerators for Toilets
    • Macerators for Bathroom
    • Accessories
  • Pumps
    • Shower & Basin Pumps
    • Kitchen & Laundry Pumps
    • Condensate Pumps
    • Rainwater Harvesting Systems
    • Accessories
  • Lifting Stations
    • Free Standing Lifting Stations
    • Inground Lifting Stations
  • SFA PumpsArrow
  • BlogArrow
  • Case Studies

Case Studies

  • All
  • Tips
  • Case Studies
  • Did you know?
  • SFA Updates
  • Under House ConversionCase Studies
    06 April 2022

    Under house conversion

    When Carla and John Giannakopoulos thought about selling their beautiful South Coogee home, the feedback that they kept receiving was that the home needed an additional, private living space.

  • Sanifos 1000 GR Twin Site - Gold Coast, QLDCase Studies
    09 January 2022

    Inground lifting station solution

    Packaged pumping stations are an efficient solution where gravity reliant sewerage and storm water systems are not possible due to limited site access and site constraints such as property sloping away from the sewer or storm water infrastructure.

  • Early Learning CentreCase Studies
    09 November 2021

    Early learning centre

    When a new early learning centre was being built in a commercial retail space, installing the plumbing amenities on the existing concrete slab was only possible using SFA's range of greywater pumps and macerators.

  • Ormeggio at the SpitCase Studies
    20 October 2020

    Ormeggio restaurant

    For a fine dining restaurant, it’s incredibly important to have self-contained facilities. The last thing a restauranteur wants is for their exclusive clientele to leave the restaurant to use the not-so-nice public amenities.

  • Luxury Cabin - Exterior (Sanicubic 1 WP)Case Studies
    02 October 2020

    Heritage cabin upgrade

    Located south of Sydney, nestled between Murramarang National Park and the white sands of Pebbly Beach are the picturesque luxury cabins of Pebbly Beach Escape.

  • End Of Trip Facility - Monash Conference Centre Case Studies
    30 September 2020

    End of trip facility

    Located at the Paris end of Collins Street, the Monash Conference Centre features amazing spaces, leading technology, award-winning food and a state-of-the-art end of trip facility. This facility provides bike storage, showers and lockers for commuters to store their belongings and get ready for work.

  • Service Station Coffee Machine - SanispeedCase Studies
    28 September 2020

    Service station coffee machines

    When one of the biggest petroleum companies made the decision to install new coffee machines in their stores nation-wide, they had the issue of no access to traditional plumbing. Where previously their coffee machines had released waste into a plastic container under the bench, they knew they wanted a better solution.

  • Surat Basin Mining CampCase Studies
    14 September 2020

    Surat Basin Mining Camp

    To create all-inclusive accommodation for multiple temporary mining camps for up to 180 people, a plumbing solution that complies with strict environmental regulations was needed. A range of Saniflo SFA lifting stations and macerators were used as a solution which was both feasible and environmentally friendly.

  • Waterfront Property - BathroomCase Studies
    07 September 2020

    Sydney waterfront property

    For this luxury waterfront home a gym and sauna were a key part of the build. The ideal location for these facilities was identified: Right at the waters edge. Due to the sloping nature of the block and the waterfront being the lowest point, conventional plumbing was not an option.

  • Limb Clinic - Sanispeed Sink Pump-out UnitCase Studies
    24 August 2020

    Upper limb clinic

    Securing a modern space on the top floor of a high rise with great exposure leading into the city is a dream for most. For a clinic and day surgery, this presents its own set of challenges. Creating a purpose-built clinic equipped with sterilising machines, washbasins, bathrooms and kitchenettes required multiple plumbing solutions.

  • Medistay facility Case Studies
    11 February 2020

    Medistay hospital accommodation

    To turn an empty office floor into high-quality accommodation is no easy task. Especially when the office space is located on the second floor of a building, with no access to traditional, gravity plumbing.

  • Last page link
  • Arrow
  • 1
  • 2
  • 3
  • Arrow
  • Last page link
  • About us
    • SFA History
    • SFA Group
    • Contact us
  • Essential
    • Products
    • Solutions
    • Technologies
    • Document Centre
    • Warranty
  • Professionals
    • Designer Hub
    • Plumber Portal
    • Resource Centre
  • About you
    • Speak Up
Follow us
  • Linkedin
  • Facebook
  • Youtube
  • Instagram
Australia
  • Cookies
  • Legal Mention
  • Privacy policy
  • My preferences
  • Site Map
© SFA Pumps - All rights reserved 2026